Provide Motor Starter and Power Switching Solutions for Industrial Original Equipment Manufacturers and Panel Builders; Compact Design Saves Space in Cabinet and Smart Wiring Technologies Help Enable Faster Assembly
ATLANTA, GA — (Marketwired) — 07/12/16 — There may be a full four years between every Olympic Games, but deploying Olympic Games-scale power distribution, backup power and protection systems typically comes down to the final months — or even weeks — before the Opening Ceremony of the Olympic Games. For the Rio 2016 Olympic Games in August, GE Energy Connections (NYSE: GE) is implementing a series of "fast-track" processes based on lessons learned from work at five previous Olympi
Modules Enable Engineers to Design in the Negative Space and Pack More Computational Power under the Hood; Rich Digital Features, High Density, Fast Time to Market and High Reliability Offer Differentiation and Acceleration to Aggressive Board Designers
GE–s Equipment Insight Turns Data into Results for Tecogen–s Combined Heat and Power Units; Solution Improves Data Collection, Analyzation and Management Capabilities, Providing a More Robust Offering for Tecogen–s Customers