MONTREAL, CANADA — (Marketwire) — 07/27/11 — In addition to its current 400 metric tons of P1 grade production, Phostech will add an extra 500 metric tons of production capacity for its advanced grade. The new capacity is expected to come on stream in Q4 2011. This investment allows Phostech to diversify its product portoflio and helps to serve the increasing demand for its products.
Christian Knobloch, General Manager of Phostech, says, “We are excited about this new product which generates significant interest due to its improved performance.”
Contacts:
Phostech Lithium Inc.
General Manager
Christian Knobloch
450-653-1810
You must be logged in to post a comment Login